MILTEN YENIKOY PORT
In 1993, Milten Corporate Group has planned a Port construction, the purpose of which was Commerce and Industry, on the region where they run coalmine stratum on 7 km Eastward of Karaburun town which is located on 70km Westward of Istanbul, on Blacksea shore. For this purpose, STFA Mühendislik A.Ş. was commissioned for Preliminary works of Port Facilities, Feasibility Study and preparation of Master Plan.
Within the four years period, which had passed to receive the necessary permissions, Turkey and her near abroad had witnessed new developments which had changed the socio-economic structure in an unexpected way, so that to update these studies had become obvious.
Below studies done by our company 2ER-CEI within the scope of recommissioning of STFA Mühendislik A.Ş. ;
-
Load Demand Analysis
-
Port Planning
-
General Port Layout Plan and Master Plan Equipment Selection
-
Financial Feasibility Report
Due to the big holes emerging from the coal drawing, the system had been developed as an inner Port and the open sea access had been ensured by a connection canal preserved by a breakwater.
Wharfs are projected as cast-in-place caisson system and by using sliding form casting in the dry, significant savings in terms of time and finance have been achieved.
Milten Port has been planned as multipurpose Port including dry bulk cargo, general cargo, Container and Liquid Terminals.