KAZAKHSTAN KARABUTAK HIGHWAY REHABILITATION PROJECT
Project Name: Kazakhstan – Karabutak Highway Rehabilitation Project
Year of Construction: 2003
Construction Cost: 350.000.000 $
Service Type:Consultancy for technical informations and cost calculations during the tender preparations submitted by Contractor
General Overview of the Project:
Rehabilitation works of existing 495km long two lane highway between Atyrau and Oral and existing 450km long (mostly) two lane highway between Aktobe and Karabutak.
Ground works, permanent way (road superstructure), repair or renovation of 10 pieces of bridge, repair or rehabilitation of 21 pieces of bridge, repair or rehabilitation of box culvery and dreinage pipelines, traffic sign boards.