UZUNDERE 1 HYDROELECTRIC PLANT PROJECT
Project Name: Uzundere 1 Hydroelectic Plant Project
Contractor: Karadeniz Elektrik Üretim A.S.
Year of Construction: 2006
Construction Cost: $ 50.000.000 (estimated cost)
Service Type: Consultancy services for construction works (2 pieces of Regulator, Water Intake Structures, Tunnels, Forebay Pool, Penstock Pipe, Plant Structure and Surveyings for other construction works, Geological Evaluations, Specifying the Construction Methods, Preparation of tender documents and making of the tenders for the construction of 45MW- Hydroelectic Plant)
General Overview of the Project: Transmittal of the water, which will be taken by the regulator and water intake structures constructed on 1500m levels on Uzundere and Incesu streams on the East Blacksea region, to the forebay pool via the tunnels the total length of which is 11.000m and the diameter of which is 3.20m, and delivering the energy, which will be produced by bringing the 800m level plant structure via the penstock pipe, to the 12km away transformer via the transmission line from the switchyard.